楼梯系统

楼梯材料包应协调钢楼梯框架、平台、踏步、OSB 基层、饰面层、墙体支撑、栏杆固定和相关配件。 对于轻钢别墅项目,楼梯细节应在生产前确认,因为它会连接结构、楼面饰面和现场安全要求。

Halcyon 可根据层高、楼梯布局、饰面偏好、栏杆类型和项目安装顺序准备楼梯材料方案。 最终楼梯尺寸和安全要求应在报价前结合图纸审核。

框架与踏步协调楼梯框架、平台、OSB 基层和饰面层应作为一个整体材料包审核。
栏杆固定审核立柱底座、拉杆、盖板、螺栓和饰面厚度会影响配件范围。
Light steel villa wall supported stair frame with treads landing OSB board and wall plate fixing detail
Wall-supported stair frame detail for reviewing landing, steel treads, OSB board, L40 steel member, fine stone concrete, tile finish and wall plate fixing.

产品概览

Use this staircase system page to review how the stair package connects the structural stair frame, tread build-up, finish layers, balustrade fixing and installation accessories before quotation.

完整楼梯材料包

The stair scope can include steel stair frame, stringer truss, landing details, OSB base, concrete or mortar layers, finish layer, balustrade posts and fixing accessories by project.

基于尺寸的审核

Storey height, stair width, landing position, tread depth, riser height and stair opening should be confirmed from drawings before production.

栏杆选项

Timber, aluminium, zinc steel or stainless steel balustrade options can be reviewed according to architectural style, budget and local safety requirements.

安装协调

Wall support, frame fixing, finish thickness, post base, rods, bolts, covers and packing labels should be coordinated with the installation sequence.

关键栏杆固定细节

These two drawings show common balustrade fixing directions. They help buyers understand that balustrade material choice also affects post base, fasteners, finish thickness and stair accessory scope.

Light steel villa aluminium zinc steel stainless steel balustrade fixing detail with LGS frame and OSB stair base

Balustrade Fixing

This detail shows aluminium, zinc steel or stainless steel balustrade fixing for a light steel villa staircase. It helps clarify the relationship between post base, expansion bolts, OSB stair base, cement mortar layer, face layer and LGS frame.

  • Balustrade post, post base, cover and expansion bolts should be included only when confirmed in the stair scope.
  • Fixing method should be reviewed together with tread build-up, finish layer and local installation requirements.
  • Final balustrade material, height and safety requirements should be confirmed by project drawings or local rules.
Light steel villa timber balustrade fixing detail with thick timber floor and LGS stair frame

Timber Balustrade Fixing

This detail shows a timber balustrade fixing method with timber post, M8 rod, glue filler, thick timber floor, 18mm OSB board and LGS stair frame connection.

  • Timber balustrade fixing should be coordinated with tread finish thickness and OSB base layer.
  • M8 rods, filler, post location and stair frame connection details affect accessory quantities.
  • Final timber finish, post section and fixing detail should be confirmed before production and packing.

System Information

Before quotation, the staircase scope should be reviewed from stair drawings, storey height, landing dimensions, balustrade preference, tread finish and installation sequence.

图纸审核Review stair plan, section, storey height, stair opening, landing, tread and riser dimensions.
Frame SelectionCoordinate stair frame, stringer truss, wall support, landing and fixing method by project.
Finish ReviewConfirm tread finish, OSB base, mortar or concrete layer, balustrade type and accessory scope.
Quote ScopeConfirm dimensions, included accessories, packing labels and delivery sequence before quotation.

材料构造关系

The staircase system connects the structural stair frame, floor levels, tread finish, balustrade fixing and installation accessories. Final material choices should follow confirmed stair dimensions, finish schedule and local safety requirements.

Frame and Landing

  • Steel stair frame, stringer truss, wall support and landing details should match the stair drawings.
  • Storey height, stair opening and landing dimensions affect production and packing sequence.
  • Frame fixing details should be reviewed together with surrounding wall and floor systems.

Tread and Finish Layers

  • OSB base, concrete or mortar layer, tile finish, timber finish or other tread finishes should be confirmed by project.
  • Finish thickness affects thresholds, balustrade post fixing and final stair dimensions.
  • Wet or exterior exposure, if any, should be clarified before material selection.

Balustrade and Accessories

  • Timber, aluminium, zinc steel or stainless steel balustrade options require different fixing details.
  • Post bases, rods, expansion bolts, covers, glue filler and screws should be included only when confirmed.
  • Local safety requirements for balustrade height, spacing and handrail details should be checked by project.

提交楼梯系统范围审核

Send stair plans, sections, storey height, landing dimensions, preferred tread finish, balustrade type and local safety requirements. We can review the staircase build-up, fixing accessories and quotation basis before final pricing.

提交报价需求

报价前请先准备项目信息

在申请轻钢房屋材料报价前,可先通过这些资料明确项目输入、材料范围和技术文件需求。

提交报价需求